Projects

Laser Scanning and BIM-modelling of the Oil Pump Station Salym Petroleum, Tyumen region, Russia

BIM-model of the oil pump station - the result of laser scanningIn January 2018 the specialists of Trimetari Consulting LLC performed the work on laser scanning and creation of the BIM-model of the multiphase pumping station located on the territory of the Upper Salym oil field, Khanty-Mansiysk Autonomous District. The history of Salym field, located in the Tyumen region, Russia, began almost 20 years ago with a little development and has reached our days as a major project for oil production. The annual production volume exceeds 6 million tons. (read more…)

Construction control of Al Rajhi Tower, Riyadh, Saudi Arabia

In December 2017, Trimetari Consulting LLC successfully completed its participation in the international project of construction control of Burj Al-Rajhi – a 50-story skyscraper in the capital of Saudi Arabia, Riyadh. During the construction of the tower, modern technologies were used, including building information modeling (BIM). The goal of the project is to create an executive 3D-model of the skyscraper using laser scanning. (read more…)

Laser Scanning for BIM of Bogoliubovsky Mining Plant, Krasnoyarsk territory, Russia

BIM-model of the mining plant, created with laser scanningIn January 2016, Trimetari Consulting LLC performed laser scanning of the main building of Bogoliubovsky Mining and Processing Plant, which processes gold-sulfide and gold-antimony ore. The purpose of the work is to create an executive BIM-model of the facility. The industrial building with an area of ​​more than 3000 m², multi-level structures, technological equipment and communications were scanned in 2 days. The resulting point cloud was later used to build an accurate and up-to-date BIM model of the factory. (read more…)

BIM reconstruction of historical building with laser scanning, Moscow

TruView panorama of the basement with utilitiesIt is challenging to meet quality requirements for reconstruction and modernization of complex buildings projects. The more complex the building, the more time architects spend measuring. Manual measurements are, moreover, usually inaccurate and incomplete if access to certain parts of the structure is difficult to reach. But, is there a better way to measure and obtain up-to-date as-built documentation? (read more…)